FNE LOKVA 1–6 (ground-mounted)
Estimated annual generation: 6 × 325,000 kWh (1,950,000 kWh total).
The plant uses panels with an improved temperature coefficient.
HANERSUN 575 Wp TOPCon panels
Sungrow SG125CX-P2 125 kW inverters
Located in Brankovići, in the municipality of Rogatica.
Built and commissioned on 1 March 2024.
Project information
FNE LOKVA 1-6
Brankovići, Rogatica
6 × 249.55 kWp
"PLANT ENERGY TRADE" doo Rogatica
