FNE LOKVA 1-6

FNE LOKVA 1–6 (ground-mounted)

Estimated annual generation: 6 × 325,000 kWh (1,950,000 kWh total).

The plant uses panels with an improved temperature coefficient.

HANERSUN 575 Wp TOPCon panels

Sungrow SG125CX-P2 125 kW inverters

Located in Brankovići, in the municipality of Rogatica.

Built and commissioned on 1 March 2024.

Project information

FNE LOKVA 1-6
Brankovići, Rogatica
6 × 249.55 kWp
"PLANT ENERGY TRADE" doo Rogatica
Cart

No products in the cart.

Create your account